Student and Housing Accommodation


  • WJL Contracts specilaise in supply repeat doorset solutions which particularly suits the delivery of student accommodation and housing schemes. With the rise in student population and the shortage of housing stock generally, WJL have seen a large increase recently in the supply and delivery of 2nd fix joinery on these schemes.

 

  • Typically we supply a high number of doorsets, ironmongery run material, and ancilllary joinery items to the bedrooms, bathrooms and living accommodation. Often we are also asked to take on first fix joinery works, decking, flooring including acoustic flooring and bespoke or standard furniture packages.

 

  • Through our Project Scheduling system we are able to fully detail out on a room by room basis the joinery items required within each room across the building. Thuis allowing for a simple transition from planning to supplier / workshop through to delivery and installation. Recent schemes include

 

  • Roehampton University Student Accommodation 1000+ doorsets
  • Bridewell House Reading Student Accommodation 300+ doorsets
  • The Tinlings Liverpool – Student Accommodation 100+
  • Clifton Estate – Housing
  • Masterman House – Housing
  • Cator Street – Housing
  • Southdown House – Housing